Our impact

IH-635 (LBJ) Managed Lanes, Texas, US

Improvement of mobility north and west of Dallas on highly congested highways through capacity expansion adding managed (tolled) lanes and maintaining existing toll-free general-purpose lanes. In operation since 2015

Background

The Project consisted of the design, construction, and now operation and maintenance of the IH635 (LBJ) Managed Lanes Project in Dallas County, Texas. The 52-year project was tendered by the Texas Department of Transportation (TxDOT) to develop 13 miles of tolled managed lanes to serve as
congestion relief for commuters.

The LBJ Managed Lanes Project rebuilt one of the busiest and most congested highways in North Texas, with an average daily traffic of over 250,000. The works were completed ahead of schedule and within the same footprint of the existing corridor in order to meet the goal “no higher, no wider” as insisted by the adjacent stakeholders and community.

In September 2017, DPFS sold its 6.6% interest to the other existing equity holders. Following this transaction, the project shareholding includes: Cintra (54.6%), LBJ Blocker (28.3%) and MI LBJ LLC (17.1%). Meridiam is managing an overall $319m in the Project including co-investors, and Meridiam has injected $89.3m of equity.

Stage:

In Operation, completion date 25 September 2015

80%

Of customers spend less than $20/month

48m

Transactions in 2019

85%

Of vehicles are NOT luxury brands

Icon/18px/arrow-up

Back to top

Share

Related stories

Collaborative last mile delivery with Shopopop

Complete range of electric vehicle charging terminals with Carrefour